Short answer To compare supplier quotes, send every supplier the same RFQ. Then convert each quote to one basis: landed cost per unit at your warehouse, in one currency. Add packaging, tooling, samples, freight, duty and the cost of paying early. In our example, the cheapest headline price ended 9.53% dearer once landed.

Key takeaways

  • Same question, same answer format: a one-page RFQ with quantity, specs, packaging and Incoterm makes quotes comparable before they arrive.

  • One basis: Incoterms 2020 has 11 rules. Under EXW the seller has no obligation to clear the goods for export, so you add that cost yourself.

  • Time is money: at an assumed 8.00% a year, payment timing cost USD 193.15 to USD 273.11 per example order.

  • Tax shapes price: China's export VAT rebate runs from 0.00% to 13.00% by product. Battery products fell from 9.00% to 6.00% on 01/04/2026.

  • Score, do not guess: in our example, the lowest headline price scored 3.15 out of 5.00. The winner scored 4.45.

Written by TRG Editorial Team · reviewed by importers

Reviewed by people who import from China every month. Every fee and rule is checked on the official page, last on 24/11/2026. How we check figures

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. It never changes our ranking. How we make money

You asked three Chinese factories for a price and got three very different answers. One quotes EXW in yuan, one FOB in dollars, one CIF to your port. Before you can compare supplier quotes, you have to turn them into the same thing.

Illustration of three Chinese supplier quotes in EXW, FOB and CIF formats flowing into one landed cost per unitThree quotes, three formats, one number to compareExample: 6,000 insulated bottles for a Rotterdam importer. All figures are TRG assumptions.AFactoryUSD 3.10FOB Ningbobox includedBTrading companyCNY 20.50EXW, no boxabout USD 3.05CFactoryUSD 3.55CIF Rotterdambox includedNormalise1. same quantity2. add missing box, labels3. tooling, setup, samples4. one Incoterm basis5. one currency6. freight, duty, charges7. cost of paying earlyLanded cost per unitat the warehouse, in USDAUSD 3.73BUSD 4.09CUSD 3.89The ranking flips: B has the lowest headline price but the highest landed cost, 9.53% above A.
three quotes, three formats: turn each one into a landed cost per unit before you choose

Most advice stops at "do not pick the cheapest". This guide gives the method: an RFQ template, a normalisation order, a scoring sheet and a worked example to landed cost per unit.

Compare supplier quotes: the quick answer

A quote comparison has two jobs. First, turn every price into the same number: landed cost per unit, at your door. Second, score what money cannot show, such as sample quality and payment risk. Do the seven steps in order, because later steps use earlier values.

StepWhat you adjustWhy it changes the ranking
1. QuantityRead the price at your real order quantityTier prices for 10,000 units mean nothing for a 6,000-unit order
2. ScopeAdd missing packaging, labels, printingA "bare" price leaves the box, labels and printing for you to add
3. One-off costsSpread tooling, setup and samples over the orderA free mould is often hidden in the unit price
4. IncotermBring EXW, FOB and CIF to one delivery pointEXW leaves trucking and export clearance to you
5. CurrencyConvert at the rate you will really payA CNY quote moves the exchange risk to you
6. Landed costAdd freight, insurance, duty, destination chargesDuty applies to freight too in the EU, UK and UAE
7. TimeAdd the financing cost of the deposit and balancePaying 50.00% at order costs more than 30.00%

After step 7 you have one comparable number per supplier. The scoring sheet then weighs it against quality, lead time and risk.

Seven-step flow to compare supplier quotes: quantity, scope, one-off costs, Incoterm, currency, landed cost, time, then scoringHow to compare supplier quotes: normalise first, then scoreDo the seven steps in order. Later steps (duty, financing) use values from earlier ones.1Quantityread your real tier2Scopebox, labels, print3One-off coststooling, setup, samples4Incotermone delivery point5Currencyrate you will pay6Landed costfreight, duty, charges7Timecost of paying earlyWeighted scoring sheetcost, quality, risk, lead time,documents, validity (1 to 5)Gatesverified company,same bank nameDecisionthen contract
from raw quotes to a decision: normalise first, then score

Get comparable quotes first: a short RFQ template

The easiest way to compare supplier quotes is to ask every supplier the same question. An RFQ is a request for quotation. If one factory prices a printed box and another a polybag, no spreadsheet can fix it later. Attach your product specification sheet for a Chinese factory, then add these blocks.

1. Product and specification

Give your spec sheet revision number and a photo. Ask for materials to be confirmed line by line. "Same as photo" is not a specification.

2. Quantities and price tiers

Ask for prices at three quantities you might order, and the MOQ (minimum order quantity) for the product, colour and box.

3. Packaging and carton

Specify the box and export carton. Ask for units per carton, carton size and gross weight: they drive freight.

4. Incoterm, port and currency

Ask everyone for the same Incoterm and named port, for example "FOB Ningbo, in USD".

5. One-off costs, samples and terms

Ask for tooling, setup and sample costs as separate lines, with tool ownership. Add payment terms, lead time and quote validity.

Annotated mock one-page RFQ with eight numbered lines every supplier must fill in the same wayA one-page RFQ: eight lines, answered the same way by everyoneMock request for quotation (fictional). Ask suppliers to reply on your table, by email.REQUEST FOR QUOTATIONreply by 05/12/20261Product / specInsulated bottle, spec rev. C, photo attached2Quantities3,000 / 6,000 / 10,000 units3PackagingGift box, 24 per carton, carton cm + kg4IncotermFOB Ningbo, price in USD (and EXW)5Tooling / setupLid mould, logo plate: price, owner6SamplesFee, courier, refund on bulk order7Payment termsDeposit %, balance trigger8Lead time / validityProduction days, quote valid untilWhat each line preventsSpec revision, not "same as photo"Price at each tier and the MOQCarton size and weight drive freightSame named port for every supplierSeparate lines, ownership in writingCount the courier tooBalance after inspection if possibleAt least 30 days validity
a one-page RFQ: the eight lines every supplier must fill in the same way

Send the RFQ by email and ask for a reply on your own table. A supplier who leaves half the lines blank is telling you something. Check the company itself with our checklist to verify a Chinese supplier.

Put every quote on one Incoterm basis: EXW, FOB and CIF

An Incoterm tells you where the supplier's price stops. The ICC's Incoterms 2020 has 11 rules. Seven work for any transport mode and four are for sea and inland waterway only. For the rules themselves, see our guide to FOB, CIF and DDP for China imports.

1. EXW: add trucking and export clearance

Under EXW (ex works), the ICC note says the seller need not load the goods. There is also no obligation on the seller to organise export clearance. Add trucking, loading and the export declaration.

2. FOB: the usual comparison point

Under FOB (free on board), the seller clears export and loads the vessel. The ICC notes FCA suits containers handed over at a terminal better.

3. CIF: separate freight and check the destination

Under CIF (cost, insurance and freight), the seller pays freight and insurance to your port. Bring all quotes forward to your warehouse, and add destination charges to the CIF quote too.

Cost blocks included in EXW, FOB and CIF prices and the blocks the buyer adds to reach the warehouseWhat each Incoterm price already containsFilled: in the supplier price. Dashed: you add it to reach your warehouse. Incoterms 2020.EXWFOBCIFGoods at the factoryin pricein pricein priceLoading, trucking, export clearanceyou addin pricein priceSea freight and insuranceyou addyou addin priceDestination charges, truckingyou addyou addyou addImport duty (on CIF-type value)you addyou addyou addEXW: ICC says the seller has no obligation to organise export clearance. CIF stops at your port: add destination costs.Duty base differs: the EU, UK and UAE include freight; the US excludes it. Compare all quotes at the same point.
what each Incoterm price already contains, and what you must add to reach your warehouse

Price freight with one forwarder quote per origin port, used for every FOB and EXW supplier. Our guide on how a freight quote from China is built explains each surcharge.

📌 Note: why bring every quote forward to landed cost rather than back to FOB? In the EU, the UK and the UAE, duty is charged on a value that includes freight. A cheaper FOB price with a bulkier carton can end up dearer at the door.

Fees and rules change often. Get the TRG Importer Brief: one short email a week with changes that affect importers.

Price tiers vs MOQ: compare at your real quantity

A price-break table tempts buyers to compare one supplier's 10,000-unit price with another's 3,000-unit price. Always compare at the quantity you will really order. Then ask whether the next tier is worth the extra stock. To lower a minimum, see how to negotiate MOQ with Chinese suppliers.

Supplier A tier (example)Unit price, FOB NingboOrder value
3,000 unitsUSD 3.25USD 9,750.00
6,000 units (your plan)USD 3.10USD 18,600.00
10,000 unitsUSD 2.98USD 29,800.00

Example: moving from 6,000 to 10,000 units cuts the price by USD 0.12. Compared with buying 10,000 units at USD 3.10, the tier saves USD 1,200.00. But 4,000 extra units at USD 2.98 tie up USD 11,920.00. Held for an extra 120 days at an assumed 8.00% a year, that cash costs USD 313.51.

Example bar chart: the 10,000-unit tier saves USD 1,200.00 but ties up USD 11,920.00 in extra stockIs the next price tier worth it? Example, Supplier AFOB Ningbo unit prices (assumed). Cost of money 8.00% a year (assumed). Storage not included.Unit price by quantity, USD (axis from 2.90)2.903.003.103.203.30USD 3.253,000USD 3.106,000USD 2.9810,000units; 6,000 is the planGoing from 6,000 to 10,000 unitsTier saving on 10,000 unitsUSD 1,200.00Cost of carrying extra stock, 120 daysUSD 313.51Net gain, if the extra units sellUSD 886.49Extra 4,000 units tie up USD 11,920.00 in stock.
example: the next price tier saves USD 1,200.00, but only if the extra 4,000 units sell

The net gain of about USD 886.49 is real only if the extra stock sells, before storage. For an untested product, buy at the tier you can sell and target the higher tier on the repeat order. If your plan sits just under a break, ask for the tier price with a longer lead time.

Tooling, setup, samples and packaging: one-off costs and who owns them

The rule is simple: spread every one-off cost over the units of this order, then note what you get to keep.

1. Tooling and moulds

One supplier charges a mould separately, another hides it in the unit price. Ask for price, cavities and tool life as separate lines. Our guide to negotiating with Chinese suppliers covers tooling refunds and ownership.

Tooling also counts at customs. EU law adds tools, dies and moulds supplied by the buyer to the customs value, if not already in the price. UK guidance adds them too, including tooling charges paid to the seller. US law treats them as an "assist" in the transaction value. Paying for a mould separately does not usually take it out of the customs value.

2. Setup and printing fees

Logo printing and colour matching often carry a setup fee. A USD 150.00 fee is USD 0.03 a unit on 6,000 units, but may repeat on each order.

3. Samples

Count the fee, the courier and any refund on the bulk order. A free sample with a USD 35.00 courier still costs USD 35.00. See how to order samples from China.

4. Packaging and carton specs

Compare cartons, not only boxes. Packing 24 units per carton instead of 20 changes the freight volume.

Example chart of a USD 900.00 mould per unit falling from USD 0.15 to USD 0.05 over three orders, with ownership cardsOne-off costs: spread them per unit, then note who owns the toolExample: Supplier B's USD 900.00 lid mould (assumed), per unit across repeat orders of 6,000.USD 0.151 order6,000 unitsUSD 0.082 orders12,000 unitsUSD 0.053 orders18,000 unitsLogo setup USD 150.00 on 6,000 units: USD 0.03 each.Three ways a factory charges for toolingPaid separately, yours by contractSpread it over this order;it is an asset for repeats.Hidden in the unit priceAsk for the split; the factoryusually keeps the tool."Free", refunded after volumeWritten credit per order,or the refund never comes.
example: how a one-off cost shrinks per unit as the order grows, and what you own afterwards

Here is what this means in practice: Supplier B in our example charges USD 900.00 for a custom lid mould. On 6,000 units that is USD 0.15 a unit. Over three orders of 6,000 it falls to USD 0.05. Compare on this order, but note the asset, if the contract makes the mould yours.

Payment terms, lead time and validity: the cost of time

Money paid early cannot work elsewhere, so every day between payment and arrival has a cost. Use your own cost of money, such as an overdraft rate. Multiply each payment by the days until arrival, divide by 365 and multiply by your annual rate. For the terms themselves, see payment terms with Chinese suppliers.

Example, Supplier A at an assumed 8.00% a year. The deposit of USD 5,625.00 waits 75 days: USD 5,625.00 × 75 ÷ 365 × 8.00% = USD 92.47. The balance of USD 13,125.00 waits 35 days, which adds USD 100.68. Total: USD 193.15.

Example payment timeline for three suppliers showing when deposit and balance are paid and when goods arriveWhen the cash leaves, and when the goods arriveExample, days from order. Cost of money at an assumed 8.00% a year, on payment x days to arrival / 365.day 0day 20day 40day 60day 80Supplier A30/70, B/L copydeposit USD 5,625.00balance USD 13,125.00, day 40arrives day 75USD 193.15Supplier B50/50, pre-shipmentdeposit USD 10,151.60balance USD 10,151.60, day 28arrives day 68USD 240.30Supplier C50/50, pre-shipmentdeposit USD 10,650.00balance USD 10,650.00, day 43arrives day 80USD 273.11paymentgoods at the warehouseBold figure: cost of money on this order.
example timeline: when cash leaves under each supplier's terms, and when the goods arrive

A longer lead time adds days to the deposit and can miss a season, so score it separately. A quote valid for 15 days may expire before your sample arrives. Ask for at least 30 days, and write the validity date on your sheet. A balance against a B/L copy also lets you book a pre-shipment inspection first.

Currency, export VAT rebate and hidden extras

1. USD or CNY: convert at the rate you will pay

A quote in CNY (Chinese yuan) puts the exchange risk on you; a USD quote may hide the factory's buffer. Convert every quote at the rate you will actually get, margin included.

The official central parity, published by the China Foreign Exchange Trade System, was CNY 6.7128 per USD on 19/11/2026. CNY 20.50 is then about USD 3.05. Market estimates that day were nearer CNY 6.67 per USD, so the rate your bank gives can differ. To lock a rate, see currency risk for importers.

2. The export VAT rebate: why tax policy moves prices

China's VAT Law took effect on 01/01/2026. Article 10 keeps a 13.00% standard rate on goods and a 0.00% rate for exported goods. The factory pays VAT on its materials, then reclaims part of it after export.

That refund is the export VAT rebate. PwC notes rebate rates for exported goods range from 0.00% to 13.00%. A full refund is not available for many goods, so the exporter carries the gap in its price.

Rates change. In Announcement No. 2 of 2026, the Ministry of Finance and the State Taxation Administration cancelled the rebate on photovoltaic and some other products from 01/04/2026. Battery products fell from 9.00% to 6.00% that day, and reach 0.00% on 01/01/2027.

Flow of the Chinese export VAT rebate: 13.00% input VAT, 0.00% on export, refund at 0.00% to 13.00% by productThe export VAT rebate: a tax rule hidden in the unit priceChina VAT Law in force from 01/01/2026: 13.00% standard rate on goods, 0.00% on exported goods (VAT Law, Art. 10).Materials boughtfactory pays 13.00%input VATGoods exportedexport sale taxedat 0.00%Rebate claimedrefund at the productrate: 0.00% to 13.00%Gap stays in priceunrefunded VAT isa cost to the exporterRates change: MOF and STA Announcement No. 2 of 2026Photovoltaic products: rebate cancelled from 01/04/2026Battery products: 9.00% to 6.00% from 01/04/2026Battery products: 0.00% from 01/01/2027A lower rebate raises the exporter's cost, so prices can follow.What to ask the supplierWho declares the export: the supplieritself, or an export agent (and fee)?Is the price "VAT included"? Exportsare zero-rated, so ask why.Any "subject to rebate rate" clause?
how the export VAT rebate sits inside a Chinese factory price

So two suppliers of the same product can price differently. One exports in its own name and claims the rebate; another pays an export agent. If a quote "includes 13.00% VAT", ask why: exports are zero-rated.

3. Hidden extras to ask about

Ask each supplier to confirm these in writing. Silence is not "included".

  • Bank charges: who pays the receiving bank's fee on your transfer.

  • Labels and marks: barcodes, warning labels and carton marks.

  • Documents: certificate of origin, test reports and their fees.

  • Pallets and wrapping: needed by some warehouses, often charged extra.

  • Price clauses: "subject to material price" or "subject to rebate rate" wording.

  • Destination add-ons: under CIF, extra charges billed by the seller's forwarder at your port.

Weighted scoring sheet: price is one line, not the decision

Pick five or six criteria, give weights that add up to 100.00%, and score every supplier from 1 to 5. Set the rules before you open the quotes. A price rule: within 2.00% of the best landed cost scores 5, up to 5.00% scores 4, up to 10.00% scores 3, above that 2.

Criterion (example weights)WeightABC
Landed cost per unit35.00%534
Sample quality vs spec25.00%435
Payment risk (when the balance falls)15.00%533
Production lead time10.00%453
Communication and documents10.00%434
Quote validity5.00%325
Weighted score (out of 5.00)100.00%4.453.154.05

These are TRG example weights, not a standard; Ship4wd's template gives unit price and quality 20.00% each. A custom-tooled product deserves more weight on quality; a commodity can weigh price more.

Example scoring heatmap of three suppliers across six weighted criteria with totals 4.45, 3.15 and 4.05Weighted scoring sheet: Supplier A wins, C is a strong secondExample scores 1 to 5; darker = better. Weights are TRG example weights, set before opening the quotes.CRITERIONWEIGHTSupplier ASupplier BSupplier CLanded cost per unit35.00%534Sample quality vs spec25.00%435Payment risk15.00%533Production lead time10.00%453Communication, documents10.00%434Quote validity5.00%325Weighted score (out of 5.00)100.00%4.453.154.05Price rule: within 2.00% of the best landed cost = 5; 2.00-5.00% = 4; 5.00-10.00% = 3; above 10.00% = 2.
example scoring heatmap: Supplier A wins on cost and risk, C on quality and validity

Some findings override any score: no factory video call, a changed company name, a price far below everyone. Treat them as gates, not low scores.

Worked example: three suppliers compared to landed cost

Example: a Rotterdam importer wants 6,000 insulated steel bottles with a laser logo. All figures are TRG assumptions, except the exchange rate; the 4.00% duty rate is assumed, so check your code on TARIC. A offers USD 3.10 FOB Ningbo, B CNY 20.50 EXW without a box, C USD 3.55 CIF Rotterdam.

Line (example, 6,000 units)A: FOB NingboB: EXW, CNYC: CIF Rotterdam
Goods (A: 6,000 × 3.10; B: CNY 123,000.00 ÷ 6.7128; C: 6,000 × 3.55)USD 18,600.00USD 18,323.20USD 21,300.00
Missing box (B: 6,000 × USD 0.18)includedUSD 1,080.00included
Tooling and setupUSD 150.00USD 900.00USD 0.00
Trucking and export clearance to NingboincludedUSD 280.00included
Currency margin (B: 0.50% of goods)USD 0.00USD 91.62USD 0.00
Sea freight, one 20ft, Ningbo to RotterdamUSD 1,900.00USD 1,900.00in price
Insurance (0.30% of 110.00% of value)USD 68.15USD 74.19in price
Customs value (CIF basis)USD 20,718.15USD 22,557.39USD 21,300.00
Duty at 4.00% of customs valueUSD 828.73USD 902.30USD 852.00
Destination charges and truckingUSD 650.00USD 650.00USD 900.00
Samples and courierUSD 0.00 (refunded)USD 83.00USD 35.00
Cost of money at 8.00% a yearUSD 193.15USD 240.30USD 273.11
Landed cost, totalUSD 22,390.03USD 24,524.61USD 23,360.11
Landed cost per unitUSD 3.73USD 4.09USD 3.89

A's customs value is USD 18,750.00 plus USD 1,900.00 freight plus USD 68.15 insurance; duty is 4.00% of it. C's destination line includes an assumed USD 250.00 add-on from the seller's forwarder. A pays 30/70 against a B/L copy; B and C pay 50/50 before shipment.

Example chart comparing headline unit price with landed cost per unit for suppliers A, B and CHeadline price vs landed cost per unit: the ranking flipsExample, 6,000 units to Rotterdam, USD per unit. Headline B converted at CNY 6.7128 per USD (19/11/2026).0.001.002.003.004.00Supplier AUSD 3.10 FOBheadline 3.10landed 3.73lowest landedSupplier BCNY 20.50 EXWheadline 3.05landed 4.09+9.53% vs ASupplier CUSD 3.55 CIFheadline 3.55landed 3.89+4.33% vs ALanded = goods, box, tooling, origin, freight, insurance, 4.00% duty (assumed), destination, samples, cost of money.
example: headline price vs landed cost per unit for the three suppliers

The ranking flips. B, the cheapest headline price, is 9.53% dearer than A once landed. C is 4.33% dearer than A. Import VAT is left out: it is the same rate for all three, and a VAT-registered buyer usually recovers it.

A wins on cost and on the scoring sheet, with 4.45 out of 5.00. C's better sample keeps it at 4.05, a strong second source. For the full method, see our landed cost guide for China imports.

What goes wrong in practice

A clean spreadsheet can still lead to a bad choice. These failures are common, with the fix for each.

1. The quotes describe different products

For example, one factory quotes 0.5 mm steel and another 0.4 mm. The cheaper quote is often a thinner product. Fix: ask each supplier to confirm your spec revision line by line, then compare the samples against it.

2. The winning price changes at the proforma

The quote has expired, or "material went up". Fix: compare only dated quotes and get the proforma before expiry.

3. The CIF quote comes with port surprises

A low CIF price can be offset by high charges at destination. Fix: ask the seller which forwarder handles the goods at your port, and get its charges in writing.

Red flag versus green flag cards for reading a Chinese supplier quoteReading a quote: red flags vs green flagsA red flag is a gate to check before scoring, not just a low score.Red flags!Price far below every other quote!No carton size, weight or units per carton!Tooling "free" with no written terms!"Price subject to change" with no date!Different company name on the bank detailsGreen flags✓Price close to the pack, with a cost split✓Carton spec and gross weight filled in✓Tool price, cavities and owner in writing✓Validity date of 30 days or more✓Same legal name on quote, PI and account
red flags vs green flags when you read a supplier quote

4. The scores are set after the favourite is chosen

Weights adjusted to fit a supplier you already like are not a method. Fix: write the weights before you open the quotes.

📌 Note: if a supplier asks for payment to a different company name than the one on the quote, stop. Check the account before you pay, as explained in our guide to how to pay a Chinese supplier.

By region: MENA, Europe/UK, USA

Your country decides which value customs taxes, so it decides where freight enters your comparison. The step-by-step process is in our hub on how to import from China.

Checklist before you pick a supplier

Once you have a winner, put the agreed terms into a contract. Our guide to clauses in a contract with a Chinese supplier lists the ones that matter.

Glossary

RFQ: request for quotation, the document that asks every supplier the same questions.

Landed cost: the full cost of goods delivered to your warehouse, including freight, duty and charges.

MOQ: minimum order quantity, the smallest order a supplier accepts for a product, colour or box.

EXW / FOB / CIF: Incoterms 2020 rules that set where the seller's costs and risks stop.

Export VAT rebate: the part of input VAT a Chinese exporter can reclaim after export, at a product-specific rate.

Assist: a tool, mould or other item supplied by the buyer that customs adds to the value of the goods.

FAQ

How many supplier quotes should I compare?

Three to five is a practical range. Fewer gives you no benchmark, and more makes it hard to give each one a proper check.

Should I compare quotes at FOB or at landed cost?

Use landed cost when duty is charged on a CIF-type value, as in the EU, the UK and the UAE. FOB of one port is a fair shortcut only when cartons are similar.

How do I compare an EXW quote with a FOB quote?

Add inland trucking, loading and the export declaration to the EXW price. Ask a forwarder for these costs from the factory address.

Is a quote in CNY cheaper than one in USD?

Not by itself. Convert it at the rate you will really pay, and remember you carry the currency risk until you pay.

How do I account for a mould in a quote comparison?

Spread the mould cost over the units of this order. Note separately whether the contract makes the mould yours for later orders.

Why do two suppliers' prices for the same product differ so much?

They may use different materials, packaging or export routes. The export VAT rebate rate and who claims it can also change the price.

How do I put a cost on payment terms?

Multiply each payment by the days until the goods arrive, divide by 365 and multiply by your annual cost of money. Add the results for deposit and balance.

How long should a supplier quote stay valid?

Ask for at least 30 days, enough time for samples to arrive and be tested. Record the expiry date on your comparison sheet.

Sources

18 official and provider pages, each with the date we checked it
Spotted a fee or rule that changed? Report an outdated fee and we will re-check it against the source.