Short answer Quarantine the goods, inspect a random sample against your contract and AQL plan, and send written notice within days. Calculate the defect rate and a costed claim. Then negotiate a credit note, refund, replacement or rework. On Alibaba.com, the refund window is 30 days from delivery. Arbitration fees start near USD 3,000.00, so small claims rarely justify it.
Key takeaways
Notice fast. Under the CISG, you must examine goods promptly and give notice within a reasonable time, and never later than 2 years after handover.
Measure, do not describe. A lot of 4,000 units inspected at Level II means 200 samples; at major AQL 2.50%, 11 major defects reject the lot.
Claim the full cost, not only the unit price. Freight share, duty, inspection and sorting can add 39.52% to the FOB value of the bad units, as in our example.
Arbitration is costly on small claims. On a USD 10,000.00 claim, published fees alone reach 29.85% at CIETAC and up to 44.15% at HKIAC.
Customs may refund the duty. The EU and UK allow claims within 1 year for rejected goods; US drawback returns 99.00% within 5 years.
Some links on this page are affiliate links. We may earn a commission at no extra cost to you. It never changes our ranking. How we make money
The container is in your warehouse, the first cartons are open, and the product is not right. You have defective goods from a China supplier you still want to work with, or at least get money back from. Most guides only say "contact the supplier". That is not a plan.
What decides the outcome is evidence measured against what you agreed, a claim with numbers, and a remedy the supplier can accept. This guide walks through each step after delivery. It covers real suppliers who shipped bad goods, not scams. If you paid a fake account, read our guide to recalling a payment sent to a scammer instead.
Defective goods from a China supplier: the quick answer
Start by naming the problem correctly. A quality claim is a demand that the seller fixes or pays for goods that do not match the contract. It is different from transit damage, which is usually a matter for the carrier or your cargo insurance on China imports. Crushed cartons and wet pallets point to transport. Wrong material, failed tests and bad assembly point to the factory.
Next, check your leverage: money you have not paid yet, future orders, or a dispute route. The table matches common situations to the best first move.
| Your situation | Best first move | Realistic result |
|---|---|---|
| Balance still unpaid | Agree a deduction before you release the balance | Price cut on the bad units |
| Paid on Alibaba.com, within 30 days of delivery | Open a Trade Assurance refund request | Partial or full refund through the platform |
| Fully paid by T/T, repeat orders planned | Negotiate a credit note on the next order | Value back, cash later |
| Fully paid, no further orders | Ask for a cash refund with a firm deadline | Often a partial refund |
| Large claim, supplier with reachable assets | Negotiate with arbitration as a backstop | Settlement before an award, in most cases |
The first box matters most. Without a document to measure against, the claim becomes a debate about taste. Our guide to supplier contract clauses for China shows how to write one that holds up.
The first 72 hours: build an evidence pack that holds up
The first three days often decide the claim. The supplier, Alibaba.com or customs will all ask for proof. Collect evidence before you sort, rework or sell anything.
1. Quarantine the whole delivery
Stop sales and keep the goods in their original cartons, labelled "on hold". Selling units after you find the defect weakens several remedies, including EU and UK duty refunds.
2. Photograph and film with identifiers
Show the defect next to the carton mark, the lot code and a ruler. Film one sealed carton being opened. This links the defect to the factory, not your warehouse.
3. Count a random sample
Pull cartons from different pallets, not only the top layer. Use your inspection plan's sample size and record each defect as critical, major or minor.
4. Keep the shipping papers and the packaging
Keep the bill of lading, packing list, delivery note and the cartons themselves. The cartons carry the factory's marks.
5. Book an independent inspection for large claims
A third-party report is stronger than your own photos. It suits claims above a few thousand dollars; for smaller ones, a count sheet and video often suffice.
Timing also has a legal side. China is a party to the UN Convention on Contracts for the International Sale of Goods (CISG). So are the USA, Egypt and Saudi Arabia, where it entered into force on 01/09/2024. Saudi Arabia excluded Part III, which holds the buyer rules below, so a Saudi contract needs its own clauses. The UK, the UAE and Morocco are not parties (UNCITRAL status page).
When the CISG applies, Article 38 asks the buyer to examine goods "within as short a period as is practicable". Article 39 says the buyer loses the right to rely on a defect without notice "within a reasonable time". The outer limit is 2 years from handover, unless a contractual guarantee says otherwise. Send a short written notice the same week, even before your claim is costed.
Use the contract and the AQL plan as your yardstick
A supplier cannot argue with its own documents. Gather the purchase order (PO) or proforma invoice (PI), the specification annex and photos of the sealed golden sample. A golden sample is the approved reference unit both sides keep. If you never sealed one, our guide to ordering samples from China explains how for next time.
Then judge the delivery with the same AQL plan you would use before shipment. AQL means acceptance quality limit: the most defects a sample may contain before the lot fails. Our pre-shipment inspection guide explains AQL tables and inspection levels in full.
Here is what this means in practice. QIMA's AQL guide uses a lot of 4,000 units at General Inspection Level II. That gives code letter L and a sample of 200 units (QIMA AQL guide). At AQL 2.50% for major defects, the lot is accepted with 10 or fewer defects and rejected at 11.
QIMA notes that critical defects usually carry an AQL of 0, and minor ones often 4.00%. Quote these limits, and the contract clause that sets them, in your claim.
📌 Note: A passed pre-shipment inspection does not end your rights. It weakens claims for visible defects the inspector should have seen. It does not cover hidden defects, such as a coating that peels after ten uses. Say clearly which type you are claiming.
Fees and rules change often. Get the TRG Importer Brief: one short email a week with changes that affect importers.
How to calculate the defect rate and the claim amount
Suppliers respond to numbers. "Many units are bad" gets an apology; "9.00% major defects on a 200-unit sample" gets a calculation back.
Use three simple formulas:
Sample defect rate = defective units in the sample ÷ sample size. Example: 18 ÷ 200 = 9.00%.
Estimated defective units = sample defect rate × lot size. Example: 9.00% × 4,000 = 360 units.
Claim amount = defective units × landed unit cost, plus inspection, sorting and disposal costs you can document.
A sample is an estimate, and the supplier may dispute it. The cleanest answer is a 100.00% sort: check every unit and claim the exact number found. If the lot failed, the supplier pays for the sorting.
Use the landed unit cost, not only the FOB price, because each bad unit carried freight and duty. Our guide to the landed cost of China imports shows how to build that figure. Keep receipts for every extra cost, because unsupported lines are the first ones a supplier deletes.
CISG Article 74 allows lost profit, but only losses the seller "ought to have foreseen". Negotiated settlements rarely include it, so keep it as a bargaining point.
The negotiation sequence, step by step
A quality claim is mostly a negotiation, and order matters. The days below are indicative and assume a cooperative supplier.
1. Send the notice (day 1 to day 3)
Write a short email: order number, lot code, defect type, sample result and photos. Say that a costed claim will follow.
2. Ask for the root cause (day 3 to day 7)
Ask what went wrong in production and how it will be fixed. Many factories answer with an 8D report, a standard eight-step problem-solving form. The answer tells you whether to keep the supplier.
3. Send the costed claim (day 5 to day 10)
Attach the evidence pack and a one-page calculation. Name the remedy you prefer and one alternative. Two acceptable options settle faster than one demand.
4. Handle the counter-offer (day 10 to day 20)
Expect a lower offer, often a replacement or a discount on the next order. Accept the principle and argue the amount. Ask for any credit note in writing, with a value, a currency and an expiry date.
5. Send a final letter (around day 21)
If talks stall, send a formal letter with a deadline, such as 14 days. State the formal route you will use next. Keep the tone factual, because the letter may become evidence.
Keep all talks in writing, or confirm each call by email the same day. Do not threaten what you will not do. If the sales manager stalls, write to the owner, who can approve larger settlements.
Credit note vs refund vs replacement: which remedy to accept
There are four practical remedies. Each moves a different cost to a different side, so compare them on cash, time and risk, not only on the headline value.
| Remedy | Cash back | Best when | Main risk |
|---|---|---|---|
| Cash refund | Now | You will not reorder | Supplier refuses or delays |
| Credit note on next order | Later, as a discount | You plan to reorder soon | Supplier closes, or raises the next price |
| Replacement units | None; goods instead | Product is fine once made right | New freight and duty, new defects |
| Local rework paid by supplier | Repair cost refunded | Defect is easy to fix locally | Rework costs more than planned |
The CISG gives a legal frame for these choices. Under Article 46, the buyer may demand repair unless that is unreasonable. Substitute goods can be demanded only for a fundamental breach. Article 50 lets the buyer reduce the price in proportion to the lower value, even after payment.
A credit note is the most common settlement, because it costs the factory no cash today. Deduct it as a separate line on the next PI, before you pay the deposit.
Replacement units need new freight, clearance and inspection. Add those costs to the claim, or ask the supplier to ship on DDP terms.
Trade Assurance, arbitration or court: the formal routes
If negotiation fails, three formal routes remain. Pick the one your payment method and contract allow.
1. Alibaba.com Trade Assurance
Paid through Alibaba.com? Claim a refund within 30 days from the delivery date, or 60 days for Enterprise and Enterprise Pro buyers (Alibaba.com). Our Alibaba Trade Assurance guide covers the filing steps and caps. File early, even while talks continue.
2. Arbitration at CIETAC or HKIAC
Arbitration applies only if your contract chose it. CIETAC charges a CNY 10,000.00 registration fee (CIETAC fee schedule). A law firm summary gives its fee as 4.00% of claims up to CNY 1,000,000.00, with a CNY 10,000.00 minimum. Treat that band as indicative.
HKIAC's schedule for cases filed from 01/01/2026 lists a HKD 10,000.00 registration fee (HKIAC fees). The administrative fee is HKD 15,000.00 up to HKD 400,000.00. One arbitrator may charge up to 12.10% of that sum.
The chart assumes CNY 6.70 and HKD 7.80 per USD. HKIAC figures use the maximum arbitrator fee, so they are a ceiling. Lawyers, translation and travel come on top. Our contract clauses guide explains how to choose the forum before you sign.
3. A court in the supplier's city
A Chinese court avoids arbitration fees, but you need a local lawyer and Chinese documents. China allows 4 years for claims on international sales of goods, against 3 years for most claims (China Justice Observer). A court near you is easier, but its judgment may be hard to enforce in China.
When a quality claim is not worth pursuing
Some claims cost more than they return, and a lost claim also costs time and the relationship. Four signs suggest settling for little or writing the loss off.
1. The claim is smaller than the cost of recovery
If arbitration fees would eat most of the claim, the threat is empty. Below roughly USD 10,000.00, negotiation, deduction or Trade Assurance are the only practical routes.
2. You have no leverage left
You paid 100.00% off-platform and will not reorder. The supplier has little reason to pay, so plan for a partial refund at best.
3. The defect was never specified
If the PO says only "good quality", a factory can argue that the goods match. Fix the specification for next time, and keep the evidence for a goodwill request.
4. You waited too long or sold the goods
Late notice and resold units weaken every route. A claim weeks after delivery, with half the lot sold, has little weight.
Writing off a claim still means fixing your terms and maybe your supplier. Our checklist to verify a Chinese supplier helps you vet the next one.
Worked example: a 4,000-unit cookware claim
Example (labelled assumptions): a Riyadh importer orders 4,000 non-stick frying pans at USD 9.00 FOB, so USD 36,000.00 of goods. It pays in full by T/T before shipment and does not book a pre-shipment inspection. On arrival, the coating blisters on many pans.
The importer quarantines the goods and draws a 200-unit sample. It finds 18 major defects, so the lot fails at AQL 2.50%. It then sorts all 4,000 pans and finds 344 defective units, a sorted rate of 8.60%.
| Line | Calculation | Amount |
|---|---|---|
| Defective goods at FOB price | 344 × USD 9.00 | USD 3,096.00 |
| Freight and insurance share (assumed USD 0.55 per unit) | 344 × USD 0.55 | USD 189.20 |
| Import duty paid on those units (assumed 5.00% of CIF) | 344 × USD 9.55 × 5.00% | USD 164.26 |
| Arrival inspection (assumed) | quoted fee | USD 350.00 |
| Sorting labour (assumed USD 0.10 per unit) | 4,000 × USD 0.10 | USD 400.00 |
| Disposal of defective units (assumed) | quoted fee | USD 120.00 |
| Total claim | sum of the lines above | USD 4,319.46 |
| Extra costs above FOB value | USD 1,223.46 ÷ USD 3,096.00 | 39.52% |
| Settlement: credit note on next PI | agreed | USD 3,500.00 |
| Settlement: cash refund | agreed | USD 500.00 |
| Total recovered | USD 4,000.00 ÷ USD 4,319.46 | 92.60% |
The supplier's first offer was 344 replacement pans in the next shipment. That would have covered USD 3,096.00 of goods but none of the USD 1,223.46 in costs. The costed claim moved the talk from units to money.
Why not arbitrate for the last USD 319.46? At CIETAC, the minimum fees of CNY 20,000.00 equal about USD 2,985.07, or 69.11% of the claim. For a claim this size, settlement is the rational result.
What goes wrong in practice
Most failed claims fail for avoidable reasons.
1. Reworking before recording
The team fixes units to meet a sales date, and the evidence is gone. Record the sample first, then rework. Keep a few defective units sealed as proof.
2. Blaming the supplier for transit damage
The supplier rejects the claim and is right. Check carton condition and the delivery note first. Send transport damage to the carrier or insurer.
3. A credit note with no terms
"We will compensate on the next order" has no value or date. Ask for an amount, a currency, an expiry date and a signature or company chop.
4. Paying the next deposit first
The new order starts and the credit note is forgotten. Put the credit as a deduction line on the new PI before you pay.
5. Missing the platform window
Talks run past day 30 and Trade Assurance closes. File the platform claim early. You can still settle with the supplier inside the case.
By region: MENA, Europe/UK, USA
Customs may return part of your duty on rejected goods. Check before you destroy or re-export anything.
Europe (EU): Article 118 of the Union Customs Code allows repayment of import duty on defective or non-conforming goods. The goods must be unused, beyond what proved the defect, and must leave the EU. On application, customs can instead place them under a procedure such as inward processing for destruction. Apply within 1 year of the customs debt notice (UCC Article 121).
UK: HMRC's rejected imports relief also has a 1-year limit from notification of the debt. You must apply at least 48 hours before packing the goods for re-export or destruction (GOV.UK).
USA: Rejected merchandise drawback refunds 99.00% of duties, taxes and fees. Goods must be exported or destroyed under CBP supervision within 5 years of import (19 U.S.C. 1313). Ask a licensed customs broker which duties on your entry qualify.
MENA: GCC states apply a common customs law, but refunds on rejected goods are handled by each national customs office. Ask your broker before re-export. See our guides to importing from China to Saudi Arabia and importing from China to the UAE.
Quality claim checklist
Our step-by-step guide to importing from China shows where quality control fits in the whole order. Payment terms that keep leverage are covered in our guide on how to pay a Chinese supplier.
Related guides
Pre-Shipment Inspection China (2026): Cost from USD 268.00
16 min read
SuppliersContract with a Chinese Supplier: 10 Key Clauses (2026)
17 min read
SuppliersAlibaba Trade Assurance 2026: What It Covers & How to Claim
17 min read
Free toolSetup Route Finder: which company and bank fit you?
7 questions, 2 minutes
Glossary
AQL (acceptance quality limit): the highest number of defects a sample may contain before the whole lot is rejected.
CISG: the UN Convention on Contracts for the International Sale of Goods, a sales law shared by 97 countries.
Credit note: a written promise from the supplier to reduce a future invoice by a set amount.
Drawback: a US refund of duties paid on goods that are later exported or destroyed.
Golden sample: the approved reference unit, sealed and kept by both sides, against which production is judged.
Latent defect: a hidden defect that an ordinary inspection could not find at delivery.
8D report: an eight-step problem-solving report that factories use to explain a defect and its fix.
FAQ
What should I do first when I receive defective goods from China?
Stop sales and keep the goods in their cartons. Photograph the defects with carton marks and lot codes. Then send the supplier a short written notice the same week.
How long do I have to complain about defective goods from a Chinese supplier?
Your contract may set a period. Under the CISG, notice must come within a reasonable time and never later than 2 years after handover. On Alibaba.com, the refund window is 30 days from delivery.
Should I ship defective goods back to China?
Rarely. Return freight and Chinese import rules add cost. Most claims settle by refund or credit note, with local disposal or rework.
Is a credit note as good as a refund?
Only if you will reorder soon from the same supplier. Get the amount, currency and expiry date in writing. Deduct it on the next proforma invoice before you pay the deposit.
Can I claim lost profit from a Chinese supplier?
The CISG allows lost profit if the seller could foresee it. In practice, negotiated settlements rarely include it. Use it as a bargaining point rather than your main number.
Does a passed pre-shipment inspection stop my claim?
It weakens claims for visible defects the inspector should have caught. Hidden defects that appear in use can still be claimed. Explain clearly why the defect could not be seen at inspection.
Is arbitration worth it for a small quality claim?
Usually not. Published CIETAC fees start at about USD 2,985.07, before lawyers. For claims below roughly USD 10,000.00, negotiation or Trade Assurance work better.
Can I get import duty back on defective goods?
Often, yes. The EU and UK allow claims within 1 year for rejected goods that are re-exported or destroyed. The US refunds 99.00% through rejected merchandise drawback.
This guide is general information for importers. It is not legal, tax or financial advice. Contract terms, platform rules and customs procedures change, so check them with a qualified adviser before you act on a claim.
Sources
13 official and provider pages, each with the date we checked it
UNCITRAL: CISG text, Articles 38, 39, 46, 50 and 74 (checked 11/11/2026)
QIMA: AQL acceptable quality limit guide (checked 11/11/2026)
Alibaba.com: How Trade Assurance protects your purchases (checked 11/11/2026)
China Justice Observer: Limitation periods in China (checked 11/11/2026)
Union Customs Code: Article 118, defective goods (checked 11/11/2026)
Union Customs Code: Article 121, time limits (checked 11/11/2026)
GOV.UK: Refunds and waivers on customs debt (checked 11/11/2026)
Cornell LII: 19 U.S.C. 1313, drawback and refunds (checked 11/11/2026)
Cornell LII: 19 CFR 190.41, rejected merchandise drawback (checked 11/11/2026)