Short answer Published Chinese mould-maker guides put simple single-part moulds at about USD 2,500.00 to USD 6,000.00. Multi-cavity, hard-steel or complex moulds start around USD 7,000.00 (indicative). The price is driven by steel grade, cavities, SPI life class, hot or cold runner and part complexity. Tooling is usually paid 50.00% upfront.
Key takeaways
Simple moulds: about USD 2,500.00 to USD 6,000.00 on one China-based maker's guide; complex or multi-cavity moulds from USD 7,000.00 (indicative).
Mould life is a class, not a promise: SPI class 101 means 1,000,000 cycles or more, class 105 means 500 or fewer.
Steel sets life and price: pre-hardened 718 is delivered at about HRC 30 to 36, while S136 is hardened to HRC 48 to 52.
Payment usually runs 50.00% / 50.00%, or 50.00% / 40.00% / 10.00% with a final share held until sample approval.
In our example, a four-cavity hot-runner mould costs USD 5,550.00 more but becomes cheaper per part after about 67,750 parts.
Some links on this page are affiliate links. We may earn a commission at no extra cost to you. It never changes our ranking. How we make money
You have a plastic part, and a factory has sent a tooling quote. The injection mold cost China factories quote can be USD 2,500.00 or USD 25,000.00 for what looks like the same part. Most guides stop at "it depends". This one shows what it depends on.
The price follows a short list of choices: steel, cavities, life class, runner and complexity. Then come trials, changes and payment. This guide explains each, then prices one mould line by line.
Injection mold cost in China: the quick answer by mould type
Start with the volume you expect to sell over the product's life. Lifetime volume decides almost everything else: steel, life class, cavities and runner.
Published price guides give wide ranges. HLH Rapid, a China-based mould maker, puts simple moulds at about USD 2,500.00 to USD 6,000.00. It says larger, complex, hard-steel or multi-cavity moulds start from about USD 7,000.00 (HLH Rapid). These are indicative, not quotes.
Formlabs, a US printer maker, lists USD 2,000.00 to USD 5,000.00 for an aluminium mid-volume mould (Formlabs). QualityInspection.org says Chinese tooling can save "upwards of" 40.00% on a European or US price (QualityInspection.org).
| Mould type | Typical use | Published range (indicative) |
|---|---|---|
| Prototype or aluminium mould | Test runs, a few hundred to a few thousand parts | USD 2,000.00 to USD 5,000.00 (aluminium, mid-volume run) |
| Simple steel mould, one or two cavities | Lids, clips, small housings | USD 2,500.00 to USD 6,000.00 |
| Multi-cavity or hard-steel mould | Repeat orders, tight tolerances | From USD 7,000.00 |
| Complex multi-cavity steel mould | High volume, many slides | USD 100,000.00 and more |
A quote has parts you can name: the mould base of plates, the cavity and core inserts, the runner, ejector pins and slides. Each has its own cost.
Read the tree from the top: the higher the volume, the harder the steel and the stronger the case for a hot runner. Our guide to who owns the design and mould in OEM vs ODM covers whether you should pay for a mould at all.
Mould life: SPI classes 101 to 105 explained
The SPI classes come from the Customs and Practices of the Moldmaking Industry. It is published by PLASTICS, the Plastics Industry Association, formerly SPI. It was last revised in 1996, and an update has been announced (Plastics Technology).
Chinese quotes use the class numbers as shorthand. The class is a build standard tied to a cycle count. A summary published by US moulder Plastikon gives the counts below (Plastikon).
| SPI class | Expected life | Build notes |
|---|---|---|
| 101 | 1,000,000 cycles or more | Cavities and cores at least HRC 48; highest cost |
| 102 | 500,000 to 1,000,000 cycles | Medium to high production |
| 103 | Under 500,000 cycles | Cavities and cores at least HRC 28; medium production |
| 104 | Under 100,000 cycles | Low production; lower-cost materials |
| 105 | 500 cycles or fewer | Prototype only; cheapest |
The hardness lines and the 500,000 bound for class 102 come from Fictiv, a US manufacturing platform (Fictiv). HRC is Rockwell C hardness; higher means harder.
Here is what this means in practice. A four-cavity class 103 mould run for 400,000 cycles makes up to 1,600,000 lids. Count cycles, not parts.
📌 Note: an SPI class is not a warranty. Ask the factory to write the guaranteed shot count, and the free repairs before it, on the contract.
Steel grades: P20, 718, H13 and S136 compared
Chinese quotes name steel by trade name: P20, 718, 718H, H13 or S136. Harder steel costs more and takes longer to machine, but wears less.
1. P20 and 718: pre-hardened workhorses
718 is a P20-based steel with added nickel, German number 1.2738 and Chinese grade 3Cr2NiMo. A Xometry datasheet gives HRC 30 to 36 for 718 and HRC 33 to 38 for 718H as delivered (Xometry 718 datasheet). It is supplied pre-hardened, so it is machined without later heat treatment.
2. H13: hardened for long runs
H13 is a hot-work steel, numbered 1.2344 in Germany. Meusburger, a European supplier of mould plates, lists it soft-annealed at 230 HB maximum and hardenable up to HRC 54 (Meusburger 1.2344).
3. S136: stainless for polish and humid storage
S136 is a stainless mould steel; its Chinese equivalent is 4Cr13MoV. A Xometry datasheet lists HRC 30 to 34 pre-hardened and HRC 48 to 52 when hardened (Xometry S136 datasheet). Uddeholm's similar Stavax ESR, an AISI 420 modified steel, is used at HRC 45 to 52 (Uddeholm).
How long does each steel last? Published guides disagree, so treat any shot count as indicative. QualityInspection.org gives about 300,000 shots for P20 or 718, 600,000 for 718HH and 1,000,000 minimum for H13. Fictiv gives 50,000 to 100,000 for P20, 500,000 to 1,000,000 for H13, and 1,000,000 or more for S136.
The gap comes partly from the plastic: QualityInspection.org notes that shot life depends on the polymer used. Here is what this means in practice: ask for the steel grade of the inserts and of the base separately. Haizol, a Chinese manufacturing platform, suggests asking for a steel certificate and a hardness report with the mould (Haizol).
Fees and rules change often. Get the TRG Importer Brief: one short email a week with changes that affect importers.
Cavities, part size and complexity
QualityInspection.org names complexity, size and cavity count as "the main factors". Every hour of machining, spark erosion (EDM) and fitting is in your quote.
1. Number of cavities
A cavity is one hollow that forms one part. Protolabs, a US moulder, offers two, four or eight cavities (Protolabs). More cavities mean a bigger base, more steel and more machining. In return, each cycle makes more parts, so the price per part falls.
2. Family moulds
A family mould makes different parts in one tool, such as a box and its lid. Protolabs says the parts must share a plastic and be similar in size.
3. Undercuts, slides and lifters
An undercut is any shape that blocks the part from coming straight out, such as a side hole or a clip. It needs a slide, a lifter, a collapsible core or an unscrewing system. QualityInspection.org notes that each moving part makes the tool bigger and the price higher.
4. Part size and surface finish
A larger part needs a larger base and press. Protolabs says any finish finer than as-machined needs hand work, up to an SPI-A2 mirror.
Before you ask for quotes, list cavities, finish and each undercut in your drawing pack, so every maker prices the same tool. Our guide to writing a product specification sheet for a Chinese factory shows where they go.
Hot runner vs cold runner: what it adds to the quote
The runner is the channel that carries molten plastic from the machine nozzle to each cavity. In a cold runner, that channel cools and is ejected with the parts as scrap or regrind. In a hot runner, a heated manifold keeps the plastic molten up to the gate.
The trade-off is simple. A hot runner raises the mould price but lowers the price per part. Fictiv says hot runner moulds have higher initial costs, faster cycles and much less scrap. With valve gates, "there's almost no scrap at all" (Fictiv).
A cold runner still has advantages. Fictiv notes it is easier to clean and better when you change colours often.
None of these sources publishes a hot runner price. Ask for the hot runner as a separate line, with its brand and number of drops. The worked example shows how to test the payback.
DFM, T0/T1 trials and sample approval
DFM means design for manufacturability. It is the mould maker's review of your 3D file before any steel is cut. Haizol advises a DFM analysis before mould making. A good report flags thin walls, missing draft angles, sink marks and gate positions.
1. DFM review and design freeze
Ask for the DFM report in writing, with the gate and ejector layout. Sign a design freeze only after you accept it. A change in the 3D file is cheap; in hardened steel it is not.
2. T0, T1 and T2 trials
T0 is the maker's internal test of basic functions. Fictiv calls T1 "typically the first customer-facing sample" (Fictiv). One Chinese maker lists T0 as 1 day, and T1 and T2 as 1 to 2 days each. It asks for 5 to 10 consecutive shots, with samples from each cavity (Boxu Mold).
Haizol gives about 20 to 30 days to first sample for steel moulds and 10 to 18 days for simple aluminium ones. Minor defects at T1 are normal.
3. Modification costs: who pays for changes
No published price list covers mould changes, because each change is different. The rule to write down is simple. If T1 parts miss your approved drawing, the fix is the maker's cost. If you change the design after the freeze, you pay.
Ask for each change as a quoted line, with its delay, before you approve it.
Sign and seal two approved samples, one for each side. Our guide to ordering samples from China and the golden sample explains how that reference is used later in inspections.
Payment schedule for a mould: deposit, T1 and approval
Mould makers ask for a deposit before cutting steel. The question is how much stays unpaid until the samples are right.
| Pattern | Milestones | Published by |
|---|---|---|
| 50.00% / 50.00% | Deposit to start steel; balance after sample approval | Haizol; Team Rapid; First Mold (balance after T1 approval) |
| 50.00% / 40.00% / 10.00% | Deposit; T1 approved; golden sample approved | NewBuyingAgent sourcing wiki |
| 30.00% / 70.00% | Before mould production; after completion and testing (above USD 1,000.00) | China Importal |
Sources: Team Rapid, First Mold, NewBuyingAgent and China Importal. Under USD 1,000.00, China Importal says buyers usually pay in full upfront.
The three-step schedule protects you best, because 10.00% waits for the final sample. First Mold's terms say ownership passes to the client on full payment of the mould invoice. Our guide to payment terms with Chinese suppliers covers deposits on the production order itself.
📌 Note: pay the mould as its own invoice line, not inside the unit price. A separate line is needed to prove ownership, and customs in most markets adds it to the value of the goods anyway.
Worked example: pricing a mould line by line
Example: a Riyadh homeware brand needs a polypropylene (PP) lid and expects to sell 200,000 lids. It asks one factory to quote two moulds. All figures are TRG example assumptions, not quotes. Both totals sit inside the published ranges above.
| Line | Mould A: 2 cavities, cold runner, 718H | Mould B: 4 cavities, hot runner, 718H |
|---|---|---|
| Mould base (standard plates) | USD 900.00 | USD 1,500.00 |
| Cavity and core inserts, steel | USD 1,100.00 | USD 2,000.00 |
| CNC machining, EDM and fitting | USD 1,600.00 | USD 2,900.00 |
| Hot runner, 4 drops with controller | USD 0.00 | USD 2,400.00 |
| Polishing and texture | USD 300.00 | USD 500.00 |
| DFM report and mould-flow study | USD 200.00 | USD 200.00 |
| T0 to T2 trials, resin included | USD 250.00 | USD 400.00 |
| Mould total | USD 4,350.00 | USD 9,900.00 |
Check the sums. Mould A: 900.00 + 1,100.00 + 1,600.00 + 300.00 + 200.00 + 250.00 = USD 4,350.00. Mould B: 1,500.00 + 2,000.00 + 2,900.00 + 2,400.00 + 500.00 + 200.00 + 400.00 = USD 9,900.00. Mould B costs USD 5,550.00 more.
Now the cost per 1,000 lids. Assumptions: a press rate of USD 30.00 per hour and PP at USD 1.50 per kg. Each lid weighs 40 g. Mould A cycles in 30 seconds with 6 g of runner per lid. Mould B cycles in 25 seconds, with no runner scrap.
| Per 1,000 lids | Mould A | Mould B |
|---|---|---|
| Parts per hour | 3,600 ÷ 30 × 2 = 240 | 3,600 ÷ 25 × 4 = 576 |
| Press time | 30.00 ÷ 240 × 1,000 = USD 125.00 | 30.00 ÷ 576 × 1,000 = USD 52.08 |
| Resin | 46 kg × 1.50 = USD 69.00 | 40 kg × 1.50 = USD 60.00 |
| Mould share over 200,000 lids | 4,350.00 ÷ 200 = USD 21.75 | 9,900.00 ÷ 200 = USD 49.50 |
| Total per 1,000 lids | USD 215.75 | USD 161.58 |
Without the mould share, A costs USD 194.00 and B costs USD 112.08 per 1,000 lids. B saves USD 81.92 per 1,000. Break-even: 5,550.00 ÷ 81.92 = 67.75 thousand lids. Above about 67,750 lids, the dearer mould is the cheaper choice. Over 200,000 lids, A totals USD 43,150.00 and B USD 32,316.00.
On a 50.00% / 40.00% / 10.00% schedule, mould A is paid USD 2,175.00, USD 1,740.00 at T1, then USD 435.00. Add freight, duty and VAT with our landed cost from China guide. To put this quote beside others, use our method to compare supplier quotes from China.
Mould transfer, storage and maintenance
A mould is an asset that lives in someone else's factory. Agree storage, maintenance and transfer rules early.
1. Storage
HLH Rapid keeps custom tooling for a minimum of 3 years and gives notice before it disposes of a mould (HLH Rapid). First Mold offers free maintenance, cleaning and storage for the active life of the mould. Ask what happens after a year with no order.
2. Maintenance
QualityInspection.org advises that the supplier maintains the mould, avoids dusty or humid storage, and re-makes it if it damages it (QualityInspection.org). Humid storage is one reason buyers choose stainless S136 for cavities.
3. Transfer to another factory
Haizol suggests asking for HASCO or DME standard components, which makes a later move easier. China Importal warns that, without access to your moulds, finding a new supplier and mould can take 4 to 5 months. Ask for the 3D mould design files and spare parts list at handover.
Our contract clauses for a Chinese supplier include a tooling clause. Add the mould number, location, steel, cavities, shot guarantee and storage period.
What goes wrong in practice
Most mould disputes start with a quote that left something out.
The steel is not what was quoted. A factory may quote H13 and cut softer steel. What to do: ask for the steel certificate and a hardness report, and check the insert stamps at T1.
The cheap quote covers inserts only. Haizol warns the inserts may sit in a base the supplier owns. What to do: ask whether the base is included and whose name is on it.
The mould is "free" but paid in the unit price. One US law firm reports a USD 1.00 per unit surcharge replacing a USD 8,000.00 mould. What to do: price tooling as a separate line.
T1 drags into T5. Each round adds trial fees and weeks. What to do: hold back 10.00% until the approved sample, and agree who pays which fix.
The factory will not release the mould. The same firm reports a buyer paying USD 200,000.00 to recover moulds bought for USD 90,000.00. What to do: mark the mould as yours and keep photos and invoices.
Those two cases come from China Law Blog (China Law Blog). It also recommends permanent marking with your company name and an asset number. Before any deposit, check the maker with our supplier verification checklist, as the mould shop is often a subcontractor.
By region: MENA, Europe/UK, USA
A mould paid by the buyer can raise the customs value of the parts it makes. The WTO Customs Valuation Agreement, Article 8.1(b)(ii), adds buyer-supplied "tools, dies, moulds" when not already in the price. The value may be spread over the first shipment or over planned production (WTO).
MENA: the UAE has been a WTO member since 10/04/1996 and Saudi Arabia since 11/12/2005 (WTO UAE, WTO Saudi Arabia). Declare the mould with your broker on the first shipment.
Europe/UK: EU transaction value is subject to the additions of Article 71 of the Union Customs Code (European Commission). USA: CBP lists tools, dies and molds as assists, apportioned "in a reasonable manner" (CBP). Our quote comparison guide covers the UK rules.
Checklist before you pay for a mould in China
For the bigger picture of a first import, start with our step-by-step guide to importing from China. When the mould and samples are approved, see how to pay a Chinese supplier with Wise, Payoneer or Airwallex.
Related guides
OEM vs ODM vs White Label: China Manufacturing Guide
16 min read
SuppliersContract with a Chinese Supplier: 10 Key Clauses (2026)
17 min read
SuppliersCompare Supplier Quotes from China: Scoring Sheet (2026)
16 min read
Free toolSetup Route Finder: which company and bank fit you?
7 questions, 2 minutes
Glossary
Mould base: the frame of steel plates that holds the inserts, guides and ejector system.
Cavity and core inserts: the hard steel blocks that shape the outside and inside of the part.
SPI class: a mould build class from 101 (1,000,000 cycles or more) to 105 (500 cycles or fewer).
HRC: Rockwell C hardness; higher numbers mean harder steel.
Hot runner: a heated channel that keeps plastic molten up to the gate, with little scrap.
DFM: design for manufacturability, the maker's review of your part before steel is cut.
T0 / T1: the internal function test, then the first customer-facing sample trial.
FAQ
How much does an injection mold cost in China?
One China-based maker publishes about USD 2,500.00 to USD 6,000.00 for simple moulds. Complex, hard-steel or multi-cavity moulds start from about USD 7,000.00. These ranges are indicative; your drawing decides the real price.
Why are Chinese mould quotes so different?
They often price different moulds, such as one-cavity P20 against four-cavity H13. Ask every maker to quote the same steel, cavities, SPI class and runner.
What is the difference between SPI class 101 and 103?
Class 101 is built for 1,000,000 cycles or more, with cavities at HRC 48 or harder. Class 103 is for under 500,000 cycles, with cavities at HRC 28 or more. Class 101 costs much more.
When does a hot runner pay back?
When the saving on scrap and cycle time beats the extra mould price. In our example, a hot runner mould costing USD 5,550.00 more breaks even at about 67,750 parts. Run the same sum with your own figures.
How long does it take to make an injection mould in China?
Haizol gives about 20 to 30 days to the first sample for steel moulds. Simple aluminium moulds take about 10 to 18 days. Add time for T2 and T3 corrections.
How should I pay for a mould?
Common published terms are 50.00% upfront and 50.00% after sample approval. A safer split is 50.00%, 40.00% at T1 and 10.00% at final approval. Pay the mould as a separate invoice line.
Who pays for mould modifications?
Agree it before steel is cut. Fixes for parts that miss your drawing are the maker's cost; your design changes are yours.
Does the mould cost affect customs duty?
Often, yes. Under WTO valuation rules, a buyer-paid mould can be added to the customs value, spread over one or more shipments.
This guide is general information. It is not legal, tax or financial advice. Confirm every figure with your mould maker, broker or adviser before you pay.